Experience

Client list

  • Chevron Nigeria Ltd. (CNL)
  • Total Upstream Nigeria (TUPNi)
  • Sahara group
  • Mobil Producing Nigeria Unlimited (MPNU)
  • Shell Producing Development Company (SPDC)
  • Nigeria Agip Oil (NAO)
  • Technip group
  • Delattre Bezons Nigeria (DBN)

With our growing client list and diverse project experience we project a significant increase in engineering man-hour by the coming years.

 

Project list

We have successfully executed several projects on behalf of prestigious clients.

Our project experience includes:

  • Akpo Jumpers project for Delattre Bezons Nigeria (DBN) 
    A 1,500 manhours project for the contruction of isometrics and stress analysis of jumpers for Akpo project, March 2010 - December 2010.
  • EGP3B Brownfield production platform modifications project for Chevron Nigeria Limited (CNL) 
    3,500 manhours  for Detailed Engineering Design (DED) April 2010 - May 2010.
  • Etim project for Mobil (MPN) 
    a 10,000 manhours Etim Life extension Repairs Project [Phase II Review] December 2009 - April 2010.
  • Asabo project for Mobil (MPN)
    A 5,600 manhours Asabo additional generator project [Follow - on Engineering] September 2009 - December 2009.
  • Egina FPSO offshore Basic Engineering project for Total Upstream Nigeria (TUPNI) 
    Front End Engineering Design [FEED] from February 2009 - March 2010.
  • Onshore Aviation Storage facility for Sahara group
    5,500 manhours onshore location in Port harcourt for a Detailed Design contract in 2009 for Sahara group.
    3,800 manhours onshore location in Abuja for a Detailed Design contract in 2009 for Sahara group.
  • Offshore Iyak SA / SB Wellhead Development project for MOBIL
    5,000 manhours offshore FEED contract in 2008 for MOBIL. 
  • INIM As-Built Project for MOBIL
    5,100 manhours As-built contract for Mobil in 2008.
  • Escravos Gas Project (EGP 3B) stages 1, 2, & 3 [upgrading]
    8,000 manhours Detailed Design contract on an onshore / offshore site for Chevron in 2008.
  • OK-LNG (Secondment) for Technip
    100,000 manhours Pre-FEED onshore contract in 2008 for Technip.
  • On shore asset gas management [OAGM] Project for Chevron
    An onshore 78,700 manhours Detailed Design contract in the third quarter of 2008 for Chevron.
  • Akri-Oguta pipeline Project for NAOC
    Onshore / offshore 6,000 manhours FEED contract in the third quarter of 2007 for Nigeria Agip Oil Company.
  • Ok-LNG project for Technip Italy
    A 4,700 pre-FEED onshore / offshore contract for Technip Italy in the thrid quarter of 2007.
  • Ogunu Fuel Depot project for SPDC
    In the first quarter of 2007, a 15,000 manhours Detailed Design onshore contract for Shell Producing Development Company [SPDC].
  • Onshore Brass LNG Project for NAOC
    A 27,000 manhours FEED contract in the first quarter of 2007 for an onshore location for the Nigerian Agip Oil Company [NAOC].
  • Swamp facility upgrade Project for Chevron
    In the fourth quarter of 2007, a 21,700 manhours FEED contract for the south swamp facility upgrade as well as a 13,100 manhours FEED contract for the North swamp facility was implemented for Chevron.
  • Escravos Gas Project (EGP 3B - DD) for Chevron
    In another joint venture with Technip on an onshore / offshore location. A 97,800 manhours Detailed Design contract in the first quarter of 2007 for Chevron Nigeria Ltd.
  • Escravos Gas Project (EGP 3B - FEED) for Chevron
    24,000 manhours joint venture with Technip in the first quarter of 2006. A FEED contract for Chevron Nigeria Ltd on an onshore location.
  • Akogen Phase 2 / Amp 2 Project for Total
    1000 manhours Basic Design contract for Total.
  • Bosi FPSO offshore Project for Mobil
    25,000 manhours FEED contract for Mobil in 2005 for an offshore FPSO.
  • Dibi / Olero Creek temporary production for Chevron
    1,530 manhours FEED contract on a swamp location in 2005 for Chevron Nigeria Ltd.