15 years of Experience

Having been involved in the oil and gas industry in the region for 15 years, Technip Australia has a strong track record of project experience in subsea, offshore and onshore projects.

Selected recent awards


Wheatstone Project, Australia
FEED for the Wheatstone Platform and flow assurance for the entire offshore system.


KNR Hydrogen Plant, Australia
This contact is a two stage EPCM contract to replace an existing Hydrogen plant with a new Plant of modular design, fabricated offsite, then erected and “tied in” with existing facilities as discreet packages. First production is due end 2011.


Kupe Gas Project, New Zealand
The Kupe Gas Project includes wellhead platform, pipelines and onshore processing facilities. First gas was achieved in December 2009 and the Production Station was officially opened by the Prime Minister of New Zealand in March 2010.


Greater Gorgon Upstream Development, Australia
FEED and EPCM services for the upstream facilities to the Greater Gorgon Development.


Pohokura Project, New Zealand
This contract involves the supply and installation of flexible lines and umbilicals, and the installation of the wellhead platform for the Pohokura Gas Development.


Enfield Subsea Development
The Enfield project is currently the largest of its kind in the region providing Technip Australia with the challenge of operating in water depths up to 550m.


Kikeh Subsea Installation
Installation of subsea-systems at 1350 metres water depth in Malaysia.